Specification for installation of solar lamps
Specification for installation of solar lamps
1、 Fixed position: one question two look:
1. Question 1: ask the relevant personnel whether there are underground pipelines, cables and other facilities that hinder the construction
2. Second, look at:
First look: check whether there are cables, wires, optical cables and other obstacles that hinder the installation and use of lamps and lanterns.
Second look: look at the East, South, west direction whether there are trees, buildings and other obstructions that affect the lighting of lamps and lanterns.
Solar street lamp
2、 Digging a pit: reading, drawing and measuring
1. First reading: read and understand the basic drawing, construction drawing, dot map and other relevant drawings.
2. One drawing: determine the installation position according to the point map, and draw the plane size of the foundation pit at the determined position according to the foundation drawing and construction drawing.
3. 1. Measurement: after the foundation pit is excavated, measure the length, width and depth of the pit with a tape measure to ensure that it meets the requirements of the drawing.
Attention: uniform, environmental protection
1. Neat and uniform: the muck shall be piled up in a neat and uniform manner, and shall not be stacked or scattered at will
2. Environmental protection: muck is not allowed to be directly placed on the lawn and other green belts, and the site should be cleaned up after construction.
3、 Do foundation: three confirm, three clear, three forbid
(1) 3. Confirmation
1. Size determination: determine the length, width and height of the foundation, the exposed size, the height of the bottom corner bolt, the distance between the positioning plate and the corresponding side of the foundation, the exposed size of the threading pipe, and the inner diameter of the battery compartment, etc. meet the requirements of the drawing.
2. Direction determination: determine that the foundation is parallel to the road direction, and that the positioning plate is parallel to the foundation.
3. Appearance determination: determine the level of the locating plate and ensure that the surface of the exposed part of the foundation is smooth.
Solar landscape lamp
(2) 3. Clean up
1. Clean up the excess concrete debris around in time.
2. Clean the concrete slag at the bottom of battery compartment in time.
3. Clean the concrete on the positioning plate and bottom corner bolt in time.
(3) Three prohibitions
1. If the size of foundation pit is not correct, it is not allowed to lay foundation.
2. Concrete shall not be placed directly on the ground.
3. It is not allowed to carry out the next one without confirming that the dimensions meet the requirements and the cleaning is not carried out.
4、 Installation of lamps and lanterns: clear division of labor, orderly materials, correct assembly, tight connection, detection in place, pay attention to safety, timely debugging and site cleaning.
1. Clear division of labor: transportation of materials, threading, assembly of lamp cap, connection of wires, assembly of lamp pole, vertical lamp pole, fastening, installation of storage battery, installation of controller, debugging, cleaning of the site and other processes, the division of labor is clear and assigned by special personnel.
Solar Garden Light
2. Materials in order: all kinds of materials are placed orderly and easy to use.
3. Correct assembly: lamps, lamp poles, battery modules and other related components are correctly assembled and the circuit connection is correct.
4. Connection and fastening: the bolts between the matching parts shall be tightened, and the connection of each part shall be tight.
5. Detection in place: component wiring detection, power supply identification detection, battery wiring detection, light source detection, etc.
6. Pay attention to safety: pay attention to safety when erecting the lamp pole, including the safety of personnel, articles, and the safety of surrounding people, buildings and cables.
7. Timely debugging: timely debugging after installation to ensure that the installation is correct.
8. Clean up the site: after installation, clean up the site in time, clean up all the wastes on the site, and restore the original appearance of the site. Personnel can only leave after cleaning.